July 10, 2021
fot. modelprimo.com
Content:
Intake valve cover, compressor, side cover, x 15 injector nozzles, compressor housing, O-rings, compressor base, inspection hatch, external compressor body, connector, toothed belt, injector nozzle, cover housing..
Nr 12 - Engine.
In this step, we assemble the compressor, which we put directly on the valve cover.
Connected by a V-belt, it looks interesting, especially with the injector nozzles fitted, which look like new spark plugs.
In the next stage:
Left head and candles.
July 10, 2021 | Porsche 917 KH #12 IXOCOLLECTIONS - build diary
May 15, 2021
The first Porsche in history to win the Le Mans 24 Hours in 1970 - is now available and waiting for you!