July 2, 2023
fot. modelprimo.com
Content:
Long ventilation duct A and B, Medium ventilation duct C and D, Short ventilation duct E and F.
No. 95 - BOX 24 - Ventilation.
This is a very interesting stage - assembling the body to the chassis, but also requiring a lot of patience :) - assembling the prepared tubes under the hood. Installation of the cables requires a lot of attention, because they must be properly arranged so that they do not jump out of their place when we screw the bodywork to the chassis. The best way to stabilize them in place is to glue the ends with instant glue.
Magazine subject:
Porsche 908 Coupe
In the next issue:
Left threshold
July 2, 2023 | Porsche 917 KH #95 IXOCOLLECTIONS - build diary
May 15, 2021
The first Porsche in history to win the Le Mans 24 Hours in 1970 - is now available and waiting for you!